Phase One of the Homewood Soccer Park was completed in January 2007.  Coston General Contractors, inc. were responsible for the construction of the conference pavilion as well as the entrance sign.  Phase Two of the Park began construction in March 2009.  Coston General Contractors, Inc. was resp0nsible for construction of the second restroom, a concession stand building, a regulation soccer field with field lighting and an asphalt parking lot.